Project case: Municipal road,
Zhuhai city ,Guangdong Province
Construction time: October, 2013
Construction site: yingbin road,
qinglv road etc., Zhuhai City, Guangdong Province
Road defect: pitting surface
Construction technology: Freetech’s
hot in place repaving recycling
Construction result: total
construction time was saved one month less than conventional method through
Freetech’s hot in place recycling technology, not only achieving fast
mechanized maintenance of asphalt pavement and reducing construction cost, but
also reaching equivalent performance of the newly paved road.